The objectives of this project are as follows: 
 
 To understand the application of management techniques in the control and direction of project resources  To appreciate the need for Project Management in a real project environment

 To understand the basic stages of project management in the construction industry

 To understand the basic roles of the different consultants in the construction industry

 To understand the use of "Success Criteria" in evaluating a project. 
 

Project 1 - DEFINING AND DOCUMENTING A PROJECT 

Project Management

Project 2 - Individual

This is a group assignment which predominantly relates to the topics of Industrialised Building System (IBS) as well as the materials’ embodied energy. Before embarking on this project students will be exposed with different types and methods of the IBS system and the calculation of embodied energy of different building materials in the classroom. First, the group has to design a 3-storey apartment block using mainly IBS components. Then, the group has to construct a physical model of the building to imitate the actual IBS construction process and to record all the process in a video.

01_COVER PAGE

01_COVER PAGE

02_CONTENT

02_CONTENT

03_PROJECT DESIGN ANALYSIS

03_PROJECT DESIGN ANALYSIS

04_PROGRAM VIABILITY REVISE

04_PROGRAM VIABILITY REVISE

06_DESIGN SUITABILITY

06_DESIGN SUITABILITY

07_RISK ANALYSIS

07_RISK ANALYSIS

08_MAINTENANCE STRATEGY

08_MAINTENANCE STRATEGY

05_SUCCESS CRITERIA

05_SUCCESS CRITERIA

09_GANTT CHART

09_GANTT CHART