
Bachelor of Science (Honor) in Architecture
The objectives of this project are as follows:
To understand the application of management techniques in the control and direction of project resources To appreciate the need for Project Management in a real project environment
To understand the basic stages of project management in the construction industry
To understand the basic roles of the different consultants in the construction industry
To understand the use of "Success Criteria" in evaluating a project.
Project 1 - DEFINING AND DOCUMENTING A PROJECT
Project Management
Project 2 - Individual
This is a group assignment which predominantly relates to the topics of Industrialised Building System (IBS) as well as the materials’ embodied energy. Before embarking on this project students will be exposed with different types and methods of the IBS system and the calculation of embodied energy of different building materials in the classroom. First, the group has to design a 3-storey apartment block using mainly IBS components. Then, the group has to construct a physical model of the building to imitate the actual IBS construction process and to record all the process in a video.
![]() 01_COVER PAGE | ![]() 02_CONTENT | ![]() 03_PROJECT DESIGN ANALYSIS |
---|---|---|
![]() 04_PROGRAM VIABILITY REVISE | ![]() 06_DESIGN SUITABILITY | ![]() 07_RISK ANALYSIS |
![]() 08_MAINTENANCE STRATEGY | ![]() 05_SUCCESS CRITERIA | ![]() 09_GANTT CHART |